Skip to content

Tool

Required run rate calculator

Required run rate is runs still needed divided by overs still available. 4.3 overs left is 4.5 overs, not 4.3.

If the target is 181 and you are 90 after 10 overs in a 20-over chase, you need 91 from 10 overs: 9.1 an over. The calculator is for that arithmetic, including leftover balls.

Completed overs remaining
0 to 5
Required rate9.10 an over

Questions about this calculator

01 How is the required rate worked out?
Runs still needed divided by overs still available. Balls left are counted as fractions of an over.
02 Does the rate include wides and no-balls?
Yes. The runs needed include every run the chasing side has to score, extras included.

From the cricket library

All articles